Adding Rooftop Equipment: Why Existing Flashing Details Need Review

New rooftop equipment can change more than the occupied roof area. Supports, penetrations, service access, and drainage may all need coordinated review before installation proceeds.

Assess the Proposed Change

Identify Affected Assemblies

Show how the equipment relates to the existing roof and supporting construction. The responsible project professionals should establish the required design scope.

  • Review supports and penetrations
  • Coordinate drainage and service access
  • Identify existing system requirements

Obtain Current Equipment Details

Use the selected equipment's actual dimensions and installation requirements. Similar-looking units can still require different interfaces.

Review the Existing Roof Information

Keep product and warranty records available to the roofing team. Proposed work should be coordinated with the installed system's requirements.

Develop the Installation Plan

Coordinate New Flashings

The detail should connect new work to the existing assembly. Avoid treating a penetration as a standalone metal cover without reviewing surrounding layers.

Plan Access and Protection

Equipment placement can expose the roof to additional handling. The responsible team should establish suitable access and protection for the work.

Update the Roof Record

Document final equipment locations and accepted details. Maintenance staff need current information after the installation is complete.

Let's Talk

ready to discuss your next project?

Krueger Sheet Metal delivers precision fabrication and architectural metal solutions engineered for performance, durability, and long-term value. From complex building envelope systems to custom fabrication, our team supports commercial, industrial, and institutional projects throughout the Pacific Northwest.